Selkirk, MB · 4 min read
Walk the driveway once the snow is off
Look for three things: cracks that have widened over winter, low spots holding water more than 24 hours after a melt, and edges where the asphalt or gravel has slumped outward.
Standing water is the warning sign that matters most in Selkirk. Clay does not drain, so water sits and softens the base under the surface.
Asphalt: crack fill first, seal later
Crack filling can be done as soon as the surface is dry and above about 10°C. Sealcoating should wait until the base has fully dried out — usually late May or June in Selkirk.
Sealing over a saturated base traps moisture and shortens the life of the coating.
Gravel: regrade instead of adding stone
Most Selkirk gravel driveways already have plenty of material — it has simply migrated to the shoulders. Scarifying and regrading recovers that gravel, restores the crown, and pushes water to the ditch rather than into the base.
A proper crown of roughly 2% fall from centre to edge is what keeps a clay-base driveway firm through the following spring.
Keep the water moving
Clear the culvert and ditch line at the road approach, redirect downspouts away from the driveway edge, and knock down any gravel berm that dams water on the surface.
Need a hand in Selkirk?
We provide free on-site inspections and itemized quotes across Winnipeg, Selkirk, Stonewall, and surrounding Manitoba communities.
Get My Free Quote